Saturday, April 20, 2013

20 April 2013 Roof Over the Veranda

It was Carnival day at Rain Forest International School today, so I took the opportunity to go over and take some pictures now that the roof over the veranda is getting done.

See the framework of the roof over the veranda on the right?

All the upstairs window screens were installed, and the exterior walls on the upper level have been plastered while the scaffolding could be in place.  Once the upper floor work was done, the metal roofing could b nailed in place.

Front view
From here, if you turn around and walk up the roadway, you end up at the back of the UBAC Hostel, in Stoker's yard.  And this is what the duplex looks like from Stoker's apartment.

View of the duplex from UBAC Hostel




Saturday, March 30, 2013

29 March 13 Roof

Metal roof blends in with the sky, but it's there on the left; the other side is done
Here's the view from the RFIS side of the wall.  Trusses are in place, and the guys are nailing in the metal roofing!
View from just inside the wall
Besides the roof being completed, the security bars and window frames are in, railing on the stairs, and outside wall getting plastered.
View of the roofing work from the upper floor
While I was looking up at the completed side of the roof, I suddenly got the feeling Doc Oc (from Spiderman 2) was lurking behind one of the walls!
They tell me it's electrical stuff... I still say it looks like Doc Oc
On the veranda level scaffolding is up where the guys are throwing concrete on the outside walls - a splatted layer of concrete that will give the outside plaster layer something to grab on to.
Veranda with stairway railing completed
Now for the challenge questions... How do we screen in this veranda AND keep the mosquitoes from coming up through the stairway?  Any ideas?  Cuz the bottom of these stairs is open to the out of doors.


Wednesday, March 13, 2013

March 11 Raise the Rafters at the Duplex!

The rafters for the roof went up on March 11.
From the RFIS side of the wall it looks like this...


And inside the door in the wall, turn left for this side view...

Besides the rafters, notice the metal railing on the stairs!
Foreman Johannes directs the daily work.  He is an excellent builder!  His daughter is a student at Rain Forest Int'l School (RFIS), and his wife cooks food the construction workers can buy for lunch.
Johannes makes sure the rafter is centered before it's raised in place

Up she goes!

Heard on the site that day: - "un, deux, trois, GO!"
- "No, no, no c'est trop! Go bahk"
How's that for Franglais.
pushing the rafter a tad over to center it correctly
A guy's gotta be pretty confident of a job well done to rest in that position!
Now that the rains have begun, it's important to get this roof up and keep our bedrooms from turning to pools of mud!   Thankful for an excellent safety record - still no major injuries on the construction site.


Tuesday, March 5, 2013

23 Feb 2nd Floor Progress


As of the 23 Feb this is what the duplex looks like.  I have barely had time to take pictures, let alone post them!  Sorry for the delay.  Not much looks different on the outside.  From now on, the major changes will be on the inside... until the roof goes on.

End view


Front view

Do you notice that there are bars in the lower front windows?  Window frames are going in -- with security bars built into them.

Looking out the window on the end wall facing the green door in the wall between the duplex and RFIS
When you enter the front door, and turn around, this is what you see -- the door you came through on the left and the stairway up to the bedrooms on upper level at the right.

Front entrance (left) and inside stairway (right)

Pivot left to enter an office.  The view out the office window is very peaceful.  The veranda is out the right (front of the house) window.

Office windows - view to the veranda (right) and the forest (left)

Then from that entrance/stairway point, turn around, as if you're continuing on from the entrance, and you come to the living room / dining room area.

Looking out the back corner of the building through living room windows

Now pivot again left and you can look into the kitchen, through a common room, shared with the other side of the duplex, through the kitchen, dining room and living room through the windows of the other side of the duplex!

Kitchen - see the drain pipe under the window?

I know, right now it looks like just grey concrete and mess -- which it is, but it is begining to take shape!





Wednesday, February 20, 2013

Feb. 15 Duplex 2nd Floor

Mid-way through February, and the upstairs of the duplex is turning into bedrooms, a bathroom and a storeroom.

Duplex, as seen from the RFIS side of the wall, rises yet higher.
The pile of dirt has to do with another project Ron is working on at school.

Mid-way through February, and the upstairs of the duplex is turning into bedrooms, a bathroom and a storeroom.


Climb up those stairs and you're on the veranda, with access to both sides of the duplex.


Enter that door, go up a set of stairs inside, and check out the bedrooms...
Inside 1 bedroom, looking out the door to the hall.  Notice lower left corner, Ron's signature clothes  chute!

And another bedroom has windows looking toward the door to RFIS...

Down below the living space, in between storage containers, window frames wait for installation

Another view of the duplex as of Feb. 15.  From here you can see that they're getting the tops of the walls ready to finish off and attach the roof!



Sunday, February 3, 2013

31 January 2013 - Top Level Walls Begun

It's the last day of the month.  The Running Club at Rain Forest International School have left for their 4 day trip hiking up Mount Cameroon.  And this is what the duplex looks like - from the RFIS side of the wall.

Duplex 2nd story walls peeking over the RFIS wall

Inside the gate, you see that stairs have been cemented in -- just inside the gate as well as along the side of the duplex.
New stairs (bottom) and new stairs up to the main level (middle)
The ramp is still in place for easy access to the upper floors.



Go around to the right of the ramp and see what it looks like below decks.  In the picture below, along the right side you see the last container installed.  The area to the left was supposed to be the 4th container - but it's just bigger space now.  And the space is getting used already to store furniture and appliances we're moving out of the duplex behind our house.
Storage area below the duplex is already being put to good use.



Wednesday, January 23, 2013

Jan. 22, 2013: Duplex Top Floor Pumped Up!

The concrete pump truck came again!  This time it came to pump the final floor on the duplex.
Here's what it looked like with the walls up on the first floor.  I know, it's really high for a first floor, but remember, there are storage containers at the very bottom ground level.

Top floor is prepared to receive concrete.  Stairway also ready.

Prepared floor as seen from the inside stairway.

The pump truck installed itself on the RFIS side of the wall, and extended the boom over the wall so the concrete would land on the upper floor of the duplex.


Concrete was pumped over the wall and onto the floor

About 4 truckloads in about 4 hours and the floor was nearly done.


Smooth it out -- the holes (right) are the inside stairways for each side of the duplex.
When the last truck had pumped its load, it was clear that we needed just a little bit more.  So they guys had to mix up about 5 sacs of cement to finish the job.
Not quite enough concrete in the truck to finish the job
Before leaving, the pump truck dumped what was in its system, like a big elephant plop on the ground.  The guys wheeled it by wheel barrel over to the duplex -- so glad they didn't have to do the whole floor that way!