Tuesday, March 5, 2013

23 Feb 2nd Floor Progress


As of the 23 Feb this is what the duplex looks like.  I have barely had time to take pictures, let alone post them!  Sorry for the delay.  Not much looks different on the outside.  From now on, the major changes will be on the inside... until the roof goes on.

End view


Front view

Do you notice that there are bars in the lower front windows?  Window frames are going in -- with security bars built into them.

Looking out the window on the end wall facing the green door in the wall between the duplex and RFIS
When you enter the front door, and turn around, this is what you see -- the door you came through on the left and the stairway up to the bedrooms on upper level at the right.

Front entrance (left) and inside stairway (right)

Pivot left to enter an office.  The view out the office window is very peaceful.  The veranda is out the right (front of the house) window.

Office windows - view to the veranda (right) and the forest (left)

Then from that entrance/stairway point, turn around, as if you're continuing on from the entrance, and you come to the living room / dining room area.

Looking out the back corner of the building through living room windows

Now pivot again left and you can look into the kitchen, through a common room, shared with the other side of the duplex, through the kitchen, dining room and living room through the windows of the other side of the duplex!

Kitchen - see the drain pipe under the window?

I know, right now it looks like just grey concrete and mess -- which it is, but it is begining to take shape!





No comments:

Post a Comment