Only a day late, and early enough in the day - the concrete pump truck came again for the last time, to pour the final floor of the hostel: the upstairs of the upper level.

The concrete pump is back again!
Concrete, pumped from the truck, comes pouring out of the tube onto the upper floor
From here you can see the green entrance gate at the left.
Emmanuel, Z's day guard who has been helping with construction, smooths over the surface.
Since the concrete arrived early enough in the day, there was plenty of daylight through the whole process.  Other times they had to work into the night to get the surface smoothed out right.  We are thankful for a good hard working crew.