March 2 All Lower Level Walls Done!!!

It's another landmark day in the hostel construction!  All the walls, upstairs and downstairs, of the lower part of the hostel are in!  And the floor on the upstairs of the upper level is almost ready to pour - Tuesday, March 6 is the day for that big event.

Here's how it looks as of Friday March 2

A column is being poured in the dining room to hlep support the roof trusses.
Upstairs floor of the upper level getting ready for concrete to be poured.
Pivot left for a better view: floor of upper level upstairs, looking at completed walls of the lower level upstairs.