Jan. 22, 2013: Duplex Top Floor Pumped Up!

The concrete pump truck came again!  This time it came to pump the final floor on the duplex.
Here's what it looked like with the walls up on the first floor.  I know, it's really high for a first floor, but remember, there are storage containers at the very bottom ground level.

Top floor is prepared to receive concrete.  Stairway also ready.

Prepared floor as seen from the inside stairway.

The pump truck installed itself on the RFIS side of the wall, and extended the boom over the wall so the concrete would land on the upper floor of the duplex.


Concrete was pumped over the wall and onto the floor

About 4 truckloads in about 4 hours and the floor was nearly done.


Smooth it out -- the holes (right) are the inside stairways for each side of the duplex.
When the last truck had pumped its load, it was clear that we needed just a little bit more.  So they guys had to mix up about 5 sacs of cement to finish the job.
Not quite enough concrete in the truck to finish the job
Before leaving, the pump truck dumped what was in its system, like a big elephant plop on the ground.  The guys wheeled it by wheel barrel over to the duplex -- so glad they didn't have to do the whole floor that way!

Thursday, December 13, 2012

December 13 Floor Poured in Duplex Side 2

The cement truck came again today -- this time to pour the rest of the first floor of the duplex.


Cenemt truck backs down to the duplex to deliver the last load.

Just 2 years ago this road was a foot path in the forest.


January 2011 Ron exploring the property with our architect friend Mark Post who drew up the plans for the hostel and duplex.


Looking back from the duplex toward that road, you see the men carting cement by the wheelbarrel full from the cement truck up the ramp to the 1st floor of the duplex.  This was the final load.


1st floor as seen from the first floor -- notice UBAC Hostel top left



And did you ever wonder what it looked like below this level?  Well, a forest of supports holding up the floor (or ceiling, as it is below)


It feels like a rainforest underneath the floor they're pouring -- water dripping between the boards amongst the support trees.

On the way out, back to school, I saw Emmanuel.  He used to work as our day guard at the house we now live in.  But he is a mason who has helped build other structures in the missionary community.  So we decided his talents were better put to use on the construction projects.


Emmanuel working on rebar supports
Take one last look from the door in the wall to RFIS.  See the man in the red shirt?  That's about where I was standing when I took the pics of the floor being poured... if that helps with perspective.

Pouring the first floor 2nd 1/2 of the duplex
Praising God for progress so far.  Praying it will be done and ready for us to move in before June 2013.

Friday, December 7, 2012

6 Dec. Preparing More Floor

Yesterday was picture day at RFIS.  We went to a grassy area of the campus with nice tree background.

Lining students up for an all school picture

While I waited for my turn at individual pictures, I made a quick trip through the door in the wall to check out the progress on the duplex.

The floor to the 2nd side of the duplex is being prepared.

All those sticks on the right will be used to support the ceiling (floor)



Friday, November 30, 2012

Nov. 27 - Moving On Without the 4th Container

It has come to our attention that none of the 3 empty shipping containers we've paid for is going to be delivered.  It seems they've been sold again and are not coming.  SO, we move on and continue construction without that 4th container for the ground floor.

A wall goes up instead of the 4th container, completing the ground level of the duplex.


Lower level as seen from the bottom of the (temporary) ramp
Container would have been on the left side of this space.  Now it'll be a concrete store room.
Stairway from the lower level - storage containers and laundry (in space between containers), and the upper level - living areas

The construction workers making supports out of rebar



Saturday, November 24, 2012

Nov. 19 Duplex Walls - 1 Side

While waiting (in vain) for the 4th container to arrive, it was decided to start building the walls on the one side of the duplex that has a floor poured.


Walls to one side of the duplex going up, even while the base of the 2nd side is not yet in place.

Stairs going from the containers on ground level to the 1st floor veranda of the duplex

Inside the living room, looking through the kitchen/dining room, through the 2nd side of the duplex (which isn't there yet) to the stairs leading to the door in the wall -- through that door is RFIS property.





The 2nd side of the duplex will go in the space to the right of the ramp (taken from the kitchen of the 1st side).
Looking up the ramp at the 1st side of the duplex - 2nd side still lacking 4th container for a base.



One last look before we go through the door (green door to the left) back to RFIS.  It'll be much easier to get to the duplex after these stairs are completed!

Saturday, November 10, 2012

Nov. 9 First Floor Duplex Poured

We paid for the concrete and the concrete pump to deliver -- but the pump is not working, so we reverted to the old fashioned way... sort of.  At least the concrete was delivered in a truck, which is still amazing to see in Africa.  And to get the concrete up to the first floor, above the storage containers, a special reamp was constructed.

Cement truck at the base of the ramp

First floor with ramp




bottom left corner - concrete pad to go between the 3rd and (still absent) 4th containers


Base of the walls going in after the floor was poured
At this point we can put up the walls on one side of the duplex, but without the 4th shipping container to put at the base, we won't be able to go much further in a couple weeks.  Pray for that 4th container to arrive soon!

Friday, November 2, 2012

Prayers Needed

Construction on the duplex has been one obstacle after another. 
The work started at the same time as the hostel.  But lately we're blocked by
1. need for the 4th container that will make up the base of the building.
2. even without the 4th container, we can start pouring the floor.  Concrete has been ordered - and there's not much more the masons can do before the floor is poured.

Please pray with us for a container to be delivered soon
And for the concrete to be delivered soon.

Thank you!