Thursday, May 31, 2012

May 24 Lower Apartment Plumbing

The apartment on the lower level is looking great == tile floor is in, walls painted a bright white. 
Entering the house through the front door, we're standing in the living / dining room, looking at the kitchen to the right, where some work is being done, down the hall at the left straight into the bedroom.


The first door on the left is the bathroom.   Oh but woops, the plumming fixtures were not in yet.
So, the freshly painted walls were chipped away to make way for pipes.  Then plastered up again.  Ah well, that's the way it's done here. 

plumming fixtures put in place after the walls were painted.  At least the flooring hadn't yet been installed.
If this had been Ron's primary or only job, he probably would have caught this before the plastering and paint had been done.  But we learn to live with less than perfection. 

Continue down the hall to the end, in the bedroom, turn around and this is the view.
Inside the bedroom: door to the right is storage, to the left is an office, and then the entrance to the hall.