While we were away relaxing at the beach in Kribi between Christmas and New Years, the guys on the construction site were busy putting up walls. Ron was pleased to see the progress on his first day back to work January 3rd.
|
Lower level with walls going up on left, upper level on the right; CMF in the background left and AOG shop in background right |
|
Foreground upper level; background L to R AOG shop, water tower, entrance gate, guard house, pile of cement blocks |
Now pivot to the right for the next view:
|
The orange door in the wall (top right corner) leads to RFIS property |
Now pivot 180 degrees for this view:
|
Upper level in foreground, lower level behind |
|
Upper level, lower level new walls, and CMF Hostel at top right |