Sorry, no pictures this time. But I did want to let you know that very soon we'll be pouring the floor to the upper level. This is not the 2nd floor but the bottom floor of the upper level of the split level building. Ron explained it to the kids that the hostel is kind of 2 buildings, one a little higher up the hill from the other, and they're connected by a stairway. So we're soon to start on the "2nd building."
No comments:
Post a Comment