Saturday, March 30, 2013

29 March 13 Roof

Metal roof blends in with the sky, but it's there on the left; the other side is done
Here's the view from the RFIS side of the wall.  Trusses are in place, and the guys are nailing in the metal roofing!
View from just inside the wall
Besides the roof being completed, the security bars and window frames are in, railing on the stairs, and outside wall getting plastered.
View of the roofing work from the upper floor
While I was looking up at the completed side of the roof, I suddenly got the feeling Doc Oc (from Spiderman 2) was lurking behind one of the walls!
They tell me it's electrical stuff... I still say it looks like Doc Oc
On the veranda level scaffolding is up where the guys are throwing concrete on the outside walls - a splatted layer of concrete that will give the outside plaster layer something to grab on to.
Veranda with stairway railing completed
Now for the challenge questions... How do we screen in this veranda AND keep the mosquitoes from coming up through the stairway?  Any ideas?  Cuz the bottom of these stairs is open to the out of doors.


No comments:

Post a Comment