While waiting (in vain) for the 4th container to arrive, it was decided to start building the walls on the one side of the duplex that has a floor poured.
|
Walls to one side of the duplex going up, even while the base of the 2nd side is not yet in place. |
|
Stairs going from the containers on ground level to the 1st floor veranda of the duplex |
|
Inside the living room, looking through the kitchen/dining room, through the 2nd side of the duplex (which isn't there yet) to the stairs leading to the door in the wall -- through that door is RFIS property. |
|
The 2nd side of the duplex will go in the space to the right of the ramp (taken from the kitchen of the 1st side). |
|
Looking up the ramp at the 1st side of the duplex - 2nd side still lacking 4th container for a base.
|
One last look before we go through the door (green door to the left) back to RFIS. It'll be much easier to get to the duplex after these stairs are completed!
No comments:
Post a Comment