A wall goes up instead of the 4th container, completing the ground level of the duplex. |
Lower level as seen from the bottom of the (temporary) ramp |
Container would have been on the left side of this space. Now it'll be a concrete store room. |
Stairway from the lower level - storage containers and laundry (in space between containers), and the upper level - living areas |
The construction workers making supports out of rebar |