The hostel was a bee hive of activity this afternoon. Outside, scaffolding was up on the front, while they plastered the outside walls; inside, walls are also being plastered while a saw buzzed away, cutting ceiling panels and pounding of nails in ceilings on the 2 top floors.
|
balconies off the student bedrooms |
|
Looking up the steps at the living room, nearly complete. |
Ceilings on the main floor nearly done - and being painted. Two of the 4 top level bedrooms have ceilings in as does the bathroom on the top level.
Oooo. Lookin' good! How thankful we are for safety for all the work being done and for super progress.
ReplyDeleteRight! With all the scafolding and plastering of high walls - we are thankful for a safe construction site.
Delete