Thursday, May 31, 2012

May 31 A Bee Hive of Activity

The hostel was a bee hive of activity this afternoon.  Outside, scaffolding was up on the front, while they plastered the outside walls; inside, walls are also being plastered while a saw buzzed away, cutting ceiling panels and pounding of nails in ceilings on the 2 top floors. 


balconies off the student bedrooms

Looking up the steps at the living room, nearly complete.


Ceilings on the main floor nearly done - and being painted.  Two of the 4 top level bedrooms have ceilings in as does the bathroom on the top level.

2 comments:

  1. Oooo. Lookin' good! How thankful we are for safety for all the work being done and for super progress.

    ReplyDelete
    Replies
    1. Right! With all the scafolding and plastering of high walls - we are thankful for a safe construction site.