Saturday, March 24, 2012

Mid March Top Floor Going Up

Once the top floor was poured, life got busy and I haven't been over to take pictures.  Phil Falconer graciously offered photos he has taken.  The bedroom and bathroom walls are going up fast. 





Eric DeHody works on the electricicals of the hostel
The Hostel is showing - above the wall from the RFIS campus

No comments:

Post a Comment